Fuselage Structure Dimpling

  • Allan Allan
  • September 14, 2021September 15, 2021
  • Fuselage, Side Skins
  • Hours logged: 1.2

I started dimpling the various parts that share holes with the fuselage skins this evening.

Another set of parts ready for priming. Next up is deburring and dimpling the skins.

previousFirewall Section Complete
nextReturn Fuel Line Holes and Fuselage Skin Deburring
Category Hrs Progress
Avionics/Wiring 187.9/350 54%
Empennage 294.7/296 100%
Attach 21.9 100%
Elevators 65.4 100%
Fairings 26/27 96%
Horizontal Stabilizer 47.5 100%
Inventory 2 100%
Rudder 27.6 100%
Tail Cone 88.3 100%
Vertical Stabilizer 16 100%
Finish Kit 406/490 83%
Doors & Transparencies 265 100%
Engine Mount 3 100%
Gear Leg and Wheel Fairings 104/106 98%
Inventory 2 100%
Landing Gear 24 100%
Seats and Seat Belts 8/10 80%
Spinner and Cowling 0/80 0%
Firewall Forward 35/159 22%
Control Cables 4/8 50%
Cowl Baffle 0/40 0%
Exhaust System 0/20 0%
Fuel System 0/20 0%
Mount Engine 4 100%
Oil Cooler 27/27 99%
Oil System 0/10 0%
Preheater 0/10 0%
Sensors/Instrumentation 0/20 0%
Fuselage 484.2/488 99%
Baggage Area 29.5 100%
Baggage Door 13 100%
Brake Lines 10 100%
Cabin Top 122.4/126 97%
Control System 15.2 100%
Covers & Floor Panels 28 100%
Firewall 24 100%
Flap System 3.8 100%
Fuel System 9 100%
Fwd Fuse 40 100%
Inventory 4.5 100%
Mid Fuse 64.3 100%
Rear Seat Backs 7 100%
Rudder Pedals 1 100%
Side Skins 74.3 100%
Steps 4.2 100%
Tail Attach 9 100%
Upper Fwd Assembly 12 100%
Upper Fwd Install 13 100%
Other 135.8/152 89%
A/C 45.8/48 96%
Engine Build 20 100%
Interior 62/64 96%
Oxygen 8/20 40%
Wings 60/75 80%
Aileron Actuation 17/18 96%
Bottom Wing Skins 21/25 84%
Fuel Tanks 14 100%
Pitot/AoA 8 100%
Wing Tips 0/10 0%
Workshop 21.5 100%
Setup 16 100%
Tools 5.5 100%
Total 1625.1/2031 80%

I have averaged 5.36 hrs/week (0.77 hrs/day) and have about 406 hours remaining.

Some guesses as to how long it might take to finish:
• At my average rate (October 2027)
• At 8 hrs/week (May 2027)
• At 12 hrs/week (January 2027)
• At 14 hrs/week (December 2026)