I continued with riveting the aft deck. All rivets are set except for rivets at the F-1011 bulkhead.
The horizontal stabilizer attach bars get in the way so I decided to order a longer rivet cup set instead of attempting to use the offset cup set (I haven’t had much luck with it on previous rivets).
I also finished dimpling the aft top skin and got it etched and primed.