It is getting more challenging to track time as I am working on multiple sections of the plans concurrently.
My Aerosport Carbon Fiber 310 panel arrived so I wanted to fit that up and get a better idea of what would be needed to install it.
I hadn’t finished up the upper forward yet so I continued with that section of the plans. This involved fluting and match drilling the panel support angles and match drilling the hand holds doublers.
I then drilled for nutplates and deburred, dimpled, and prepped for priming.
I then fit the 310 panel frame into place.
Starting to look more like an airplane!