I need to finalize the routing of conduit and the A/C lines before I attach the baggage compartment floors. I decided to attach the A/C condenser scoop to the bottom of the fuselage so that I can align the hoses with the z-fittings and figure out where I want to put things.
I had previously prepped the scoop and the nutplates so attaching the scoop went quickly.
![](https://airplane.allanglen.com/wp-content/uploads/2022/02/PXL_20220208_185859428.PORTRAIT-scaled.jpg)
![](https://airplane.allanglen.com/wp-content/uploads/2022/02/PXL_20220208_190709696-scaled.jpg)
![](https://airplane.allanglen.com/wp-content/uploads/2022/02/PXL_20220208_190914332-scaled.jpg)
![](https://airplane.allanglen.com/wp-content/uploads/2022/02/PXL_20220208_190717621-scaled.jpg)
![](https://airplane.allanglen.com/wp-content/uploads/2022/02/PXL_20220209_001859446-scaled.jpg)
![](https://airplane.allanglen.com/wp-content/uploads/2022/02/PXL_20220209_003300423-scaled.jpg)