Fuselage Structure Dimpling

  • Allan Allan
  • September 14, 2021September 15, 2021
  • Fuselage, Side Skins
  • Hours logged: 1.2

I started dimpling the various parts that share holes with the fuselage skins this evening.

Another set of parts ready for priming. Next up is deburring and dimpling the skins.

previousFirewall Section Complete
nextReturn Fuel Line Holes and Fuselage Skin Deburring
Category Hrs Progress *
Workshop 21.5 100%
Setup 16 100%
Tools 5.5 100%
Empennage 284.7/296 96%
Inventory 2 100%
Vertical Stabilizer 16 100%
Rudder 27.6 100%
Horizontal Stabilizer 47.5 100%
Elevators 65.4 100%
Tail Cone 88.3 100%
Attach 21.9/23 97%
Fairings 26/27 96%
Fuselage 390.2/461 85%
Inventory 4.5 100%
Mid Fuse 64.3 100%
Firewall 24 100%
Fwd Fuse 40 100%
Side Skins 74.3 100%
Steps 4.2 100%
Upper Fwd Assembly 12/16 75%
Tail Attach 9 100%
Baggage Area 29.5 100%
Baggage Door 13 100%
Covers & Floor Panels 28/29 97%
Brake Lines 10/10 98%
Fuel System 9/10 90%
Rudder Pedals 1/4 25%
Control System 15.2/16 96%
Flap System 2.8/6 47%
Upper Fwd Install 0/20 0%
Rear Seat Backs 7 100%
Cabin Top 56.4/80 71%
Wings 48/77 63%
Fuel Tanks 14 100%
Bottom Wing Skins 21/25 84%
Aileron Actuation 17/18 96%
Wing Tips 0/10 0%
Pitot/AoA 8/10 80%
Finish Kit 44/283 16%
Engine Mount 3 100%
Landing Gear 0/10 0%
Spinner and Cowling 0/80 0%
Gear Leg and Wheel Fairings 0/80 0%
Seat Belts 0/8 0%
Inventory 2 100%
Doors & Transparencies 41/100 41%
Firewall Forward 10/144 7%
Oil Cooler 6/6 96%
Mount Engine 0/10 0%
Cowl Baffle 0/40 0%
Control Cables 0/8 0%
Fuel System 0/20 0%
Oil System 0/10 0%
Exhaust System 0/20 0%
Sensors/Instrumentation 0/20 0%
Preheater 0/10 0%
Avionics/Wiring 123.9/350 35%
Mods 16/84 19%
Interior 6 100%
Oxygen 8/30 27%
A/C 45.8/48 96%
Total 938.3/1716 55%

* Based on hours reported by other builders. I have averaged 5.76 hrs/week (0.82 hrs/day) which suggests completion by April 2026.