I completed two more steps on page 10-20 this evening. This completes the riveting of the forward bottom skin to the bulkhead frames and to the side skins.
I back-riveted all of these with the exception of the rivets under the j-channels.
The rivets came out great and the side skins are tight against the bottom skin.